移至主內容
Logo van NextChem
  • NextChem
  • 职业
  • 联系方式
  • ENG
  • RUS
  • CHI
  • ENG
  • RUS
  • CHI
  • 关于我们
    返回
    关于我们
    Go to section
    • 使命与愿景
    • 历史
    • 领导团队
    • People & Careers
    • 社会责任
    • NextChem
    • 投资者信息
    • 伙伴关系
      返回
      伙伴关系
      Go to section
      • 承包商
      • 行业组织
      • 合作伙伴
  • 我们的业务
    返回
    我们的业务
    Go to section
    • Urea
      返回
      Urea
      Go to section
      • LAUNCH
      • ADVANCE
      • EVOLVE
    • NX Stami™ Digital
      返回
      NX Stami™ Digital
      Go to section
      • Process Monitor
      • Operator Training Simulator
      • Process Optimizer
      • Digital Support
    • NX STAMI 氨
    • Stami Nitric Acid
    • Stami Specialties
      返回
      Stami Specialties
      Go to section
      • Controlled-release fertilizer
      • DEF/NOx reduction
    • Knowledge Center
    • FAQ
  • 新闻
    返回
    新闻
    Go to section
    • 新闻更新
    • 新闻发布
    • 精彩活动
  • 成功案例
  • 下载

導航連結

  1. Home /
  2. node /
  3. Urea high pressure equipment loaded and on route to Russia
Publication date
七月 10, 2020
Share
Facebook Twitter Linkedin
Copy link

Urea high pressure equipment loaded and on route to Russia

Volgafert 1

Stamicarbon inspectors Farid Houhou and Alexander Feuler stayed in Austria to perform the final inspections and the follow up of the vessel. “The planning for the HP Scrubber was very tight, but by working hard we managed to have it ready for transport on time,” Alexander said. Erfan Afrasiabi (Senior Expediter, Procurement) explained that some changes to the planning had been made to ensure that all three pieces of equipment arrived at the port in time for shipping. “I believe this project is the symbol of successful coordination between the parties specially during the tough period. It is possible to keep the high level of quality and deliver on time whilst staying safe during these times”, Erfan Said.

Volgafert 3

Meanwhile the project’s Granulator has also been completed at Allgaier in Germany and is currently being shipped to Antwerp in three parts. The Granulator will be packed at the port, collected by the client and transported via road to Tolyatti. "The granulator planning was also very tight, but thanks to inspector Ralf Houben's on-site work - and the support of project manager Peter Lang and the mechanical team Tom Savelkoul and Angelo Theunissen - the delivery was met," Alexander said. Project Manager Peter Lang added: "This milestone was only achievable because of the good relationship between OEM/Stamicarbon (all parties) and the teamwork on this level."

The last major piece of equipment for the project is the MMV Scrubber, which is being manufactured by EnviroCare in the United States.

Stamicarbon is looking forward on completing the final steps of this project.

logo
Logo van NextChem
About Us
About us
  • 公司简介
    返回
    公司简介
    Go to section
    • 使命与愿景
    • 历史
    • 领导团队
    • People & Careers
    • 社会责任
    • NextChem
    • 投资者信息
    • Partnerships
  • Certificates
Our Business
Our Business
  • 我们的业务
  • 尿素
  • NX Stami™ Ammonia
  • NX Stami™ Digital
  • 硝酸
  • Stami Specialties
  • 常见问题解答
News & Events
News & Events
  • News updates
  • Press releases
  • Events
  • 成功案例
  • 下载
  • 职业
  • 联系方式
© 2026 Stamicarbon. All rights reserved.
  • Legal notice
  • Privacy
  • Cookies
  • Code of Ethics
  • Business Integrity Policy